How many fence posts and pickets for a 50 ft fence?

A straight 50 ft fence with posts 8 ft apart has 7 sections and 8 posts. A 6 ft privacy fence needs 21 rails (3 per section) and 115 pickets of 5.5 in with 5% extra, plus about 24 bags of 50 lb fast-setting concrete.

Last reviewed November 28, 2026 · How we check the numbers

Materials for a 50 ft wood fence, 4 × 4 posts, 5.5 in pickets with 5% extra
FencePostsRailsPickets50 lb concrete bags
6 ft tall, posts 8 ft apart82111524
6 ft tall, posts 6 ft apart102711530
4 ft tall, posts 8 ft apart81411516
4 ft tall, posts 6 ft apart101811520

No gates or corners: add one post for each. Concrete fills 1/3 of the fence height in a hole 3 times the post width (QUIKRETE).

Change the size or depth

The calculator is filled in for this job. Change any number, add another area or enter your local prices.

Prices (optional)

Leave any field empty to skip it.

Feet fields accept 10.5, 10' 6" or 10 ft 6 in.

Result

4x4 posts
8
Pickets
115 (incl. 5% extra)
Rails, 8 ft long
21 (3 per section × 7 sections)
Fast-setting concrete, 50 lb bags
24 (3 per post)
Gravel for drainage, 0.5 cu ft bags
5
Each hole
10.5 in wide, 30 in deep (incl. 6 in of gravel)

An estimate for buying materials, not a substitute for plans.

Full explanation, mistakes to avoid and more examples: Fence calculator.

Frequently asked questions

How many fence posts for 50 feet?

8 posts at 8 ft spacing, 10 at 6 ft spacing, for a straight run without gates.

How many pickets for a 50 ft fence?

110 pickets of 5.5 in with no gaps, 115 with 5% extra.

How many bags of concrete for a 50 ft fence?

About 24 bags of 50 lb fast-setting concrete for 8 4 × 4 posts on a 6 ft fence (3 per post). QUIKRETE’s own example uses 2 bags per post in a 10 in hole 2 ft deep.

Other sizes

Sources

  1. Lowe’s — How to Build a Wood Fence: posts 6–8 ft on center, 5-1/2 in wide pickets
  2. The Home Depot — How to Build a Fence: posts every 6–8 ft; two rails up to 4 ft tall, a third rail for taller fences
  3. QUIKRETE — Setting Posts: hole 3 times the post width, 1/3–1/2 of the above-ground height deep, 6 in of gravel
  4. QUIKRETE — Fast-Setting Concrete Mix No. 1004 spec-data sheet: about 0.375 cu ft per 50 lb bag