How many pavers for a 10 × 10 patio?
A 10 × 10 ft patio is 100 sq ft. With 4 × 8 in pavers and 5% extra for cuts you need 473 pavers. Under them go 2.3 tons of compacted base 4 in deep (1.23 cu yd) and 8 cu ft of bedding sand 1 in deep.
Last reviewed November 28, 2026 · How we check the numbers
| Paver size | Pavers per sq ft | Pavers to buy |
|---|---|---|
| 4 × 8 in (brick paver) | 4.5 | 473 |
| 6 × 6 in | 4 | 420 |
| 6 × 9 in | 2.67 | 280 |
| 12 × 12 in | 1 | 105 |
| 16 × 16 in | 0.56 | 60 |
| 24 × 24 in | 0.25 | 27 |
Counted on the face size; use the size on the pallet tag. Oregon State University Extension suggests 5% extra, or 10% with many cuts (herringbone, curves).
Change the size or depth
The calculator is filled in for this job. Change any number, add another area or enter your local prices.
Result
- Pavers to buy
- 473
- Pavers per sq ft
- 4.5
- Area
- 100 sq ft
- Base, 4 in compacted
- 2.3 tons (1.23 cu yd)
- Bedding sand, 1 in
- 8.3 cu ft (0.44 tons)
An estimate for buying materials, not a substitute for plans.
Link copied
Hey, don’t lose us! We’ve got 23 calculators for concrete, gravel, fences, roofs, floors and more. Add us to your home screen, buddy — next time it’s one tap, no searching.
- Tap Share in the browser bar (in Safari it may be under ⋯).
- Scroll down and tap Add to Home Screen.
- Tap Add.
Full explanation, mistakes to avoid and more examples: Paver calculator.
Frequently asked questions
How many 12 × 12 pavers for a 10 × 10 patio?
100 with no extra, 105 with 5% extra.
How many 16 × 16 pavers for a 10 × 10 patio?
57 with no extra, 60 with 5% extra.
How much base and sand for a 10 × 10 patio?
ICPI calls for at least 4 in of compacted base under a patio: 2.3 tons of crusher run for 100 sq ft. Bedding sand 1 in deep: 8 cu ft, about 0.44 tons.
Other sizes
Sources
- ICPI — Tech Spec 2, Construction of Interlocking Concrete Pavements: 4 in base for patios, 6 in for driveways, 1 in bedding sand
- Pavestone — Paver granular base specification: bedding sand nominal 1 in, not over 1-1/2 in
- Oregon State University Extension — 10-Step Guide to Installing Pavers: add 5%, or 10% with many cuts
- Vulcan Materials — Aggregate Tonnage Estimator: typical weight of crushed stone, base, screenings and sand